Once regular operation of my layout began I quickly became aware that the stabling point area wasnt running as smoothly an operation as I would of liked so I had to rework it a bit and run the access line to the station sidings along the front of the stabling point instead of round the back of it. That also meant I could accommodate more locos on the stabling point than I could before which was a bonus and not have a track with a ridiculously tight curve running virtually through the middle of it either. So these few pictures show the alterations I made in that area in progress.
No comments:
Post a Comment